The sidewalk construction at the corner of Thornhill and Mountain started in April and stopped in mid-May, but there is a giant corner and several driveways that still have been completed. See photo for the sign indicating that the work should have been completed by May 31. This means that as of 8/21 (today), the work is nearly 3 months behind schedule, and pedestrians are picking their way through rubble.
cũng đã hỏi...
Hỏi. How long has the construction material been there?
Đáp. 4 months
Đáp. 4 months
Hỏi. How much of the sidewalk is obstructed?
Đáp. the entire corner
Đáp. the entire corner
Hỏi. Is the material covered?
Đáp. No
Đáp. No
Hỏi. Is the material located near a storm drain inlet?
Đáp. Yes
Đáp. Yes
Hỏi. Can you identify the company doing the construction work?
Đáp. Yes- McGuire Hester
Đáp. Yes- McGuire Hester
9 Bình luậns
Được thừa nhận City of Oakland (Chính thức đã xác nhận)
DS (Người dùng đã đăng ký)
Concerned Citizen (Người dùng đã đăng ký)
Charlotte (Người dùng đã đăng ký)
Aaron Brown (Người dùng đã đăng ký)
Peggy Esposito (Người dùng đã đăng ký)
DS (Người dùng đã đăng ký)
DS (Người dùng đã đăng ký)
Đã đóng City of Oakland (Chính thức đã xác nhận)